Solar Energy:
Objectives:
- To fulfil 10% of the city’s power requirement through Solar Energy
- Installation of Solar Panels at specified sites to produce 8 MW electricity
- To generate 24 MW electricity within a time frame of 3 years
- To provide electricity to heritage buildings by Solar Energy through PPP model